Cabinet approves Green Energy Corridor Phase-III with battery storage

· By the PrepMatic team · 2 min read

On this page
  1. Scheme at a glance
  2. Why it matters for exams
  3. Practice questions
  4. Source

The Union Cabinet, chaired by Prime Minister Narendra Modi, approved the Green Energy Corridor Phase-III (GEC-III) scheme on 30 September 2026. It will strengthen the intra-State transmission system (InSTS) so that up to 135 gigawatts (GW) of renewable energy can be evacuated across States and Union Territories. It also provides for 50 GWh of Battery Energy Storage Systems (BESS).

Scheme at a glance

ItemDetail
Transmission capacityEvacuation of up to 135 GW of renewable energy
Storage50 GWh of battery energy storage systems
TargetBy FY 2032-33
Total outlay₹1,86,405 crore, as stated in the release
Transmission componentAbout ₹1.36 lakh crore
Battery storage component₹50,000 crore
Central Financial Support₹54,082 crore

Greenfield transmission projects will be built through tariff-based competitive bidding (TBCB), while brownfield upgrades will be done on a cost-plus basis. State Transmission Utilities are the overall implementing agencies, and Transmission Service Providers take part on a Build-Own-Operate-Maintain (BOOM) model.

The central assistance helps offset intra-State transmission charges, which keeps power costs down for consumers. The scheme supports the target of 900 GW of non-fossil installed capacity by 2035. BESS can be placed at the renewable developer or generator end, or at any other location that matters for grid flexibility, to manage intermittency, congestion and peak-hour curtailment.

Why it matters for exams

Energy-sector schemes, GW and GWh units and the non-fossil target are typical current affairs and economy questions for TNPSC and general awareness questions in banking exams. Revise them with the TNPSC current affairs guide.

Practice questions

Question 1

How much battery energy storage does Green Energy Corridor Phase-III provide for?

  • A. 5 GWh
  • B. 25 GWh
  • C. 50 GWh
  • D. 135 GWh

Question 2

What is the non-fossil installed capacity target the scheme supports?

  • A. 135 GW by 2032
  • B. 500 GW by 2030
  • C. 900 GW by 2035
  • D. 50 GW by 2040

Answers

  1. C. The scheme provides for 50 GWh of BESS. The figure of 135 GW refers to renewable power evacuation capacity.
  2. C. The scheme helps reach 900 GW of non-fossil installed capacity by 2035.

Source

Cabinet approves Green Energy Corridor Phase-III scheme for Development of Intra-State Transmission System with Battery Energy Storage Systems (PIB, Cabinet, 30 September 2026).

Find your weak TNPSC units before the exam does

Take a free TNPSC assessment on PrepMatic. It shows where you stand across General Tamil, General Studies and Aptitude, then builds a day-by-day study plan and mock tests focused on your weak subjects.

Start free assessment →Free forever plan · No credit card · 2-minute setup

Related

More in September 2026

← All current affairs